Gas Turbine : GE LM6000PC – 50 MW – 8,500 operation hours since new and YOM is 2011
HRSG Boiler : IST HRSG – Once Through Steam Generator OTSG
Steam Turbine : Siemens SST 300 – 13.35 MW
Main DCS : Siemens T3000
Sub Station : Siemens 65 MVA & 18 MVA Transformers
HV System : Siemens
MV System : Siemens
LV System : Siemens
Control Instruments : Siemens & ABB
Air Compressors : Atlas Copco
Demi Water Systems: 1000m3 Raw & 200 m3 Demi Water Tank
UPS & Rectifiers : AEG-Artronic
Control valves : FlowServe
Safety Valves : Farris
High Pressure Pumps : KSB (ABB & Siemens Motors)
Low Pressure Pumps : KSB(ABB & Siemens Motors)